Stephane Moluh 9/25/2024 Friday, September 27, 2024 WSAXIS-100: Added Microwave Water Level Data and Predicted Data for Erddap 6 minutes Water Level Monday, September 16, 2024 NA
Stephane Moluh 9/20/2024 Friday, September 20, 2024 WSAXIS-100: Datum code validation completed, descriptions and access rights code added Monday, September 16, 2024 NA
Stephane Moluh 9/13/2024 Friday, September 13, 2024 Ws-axis 100: Datum code, water level value formatting and computation and validation Tuesday, September 10, 2024 NA
Stephane Moluh 9/6/2024 Friday, September 6, 2024 WSAXIS-100: working on formatting date to timestamp, processing the water level value based on the appropriate datum, code change on the raw 6 minutes water level in other to match different sensor types Tuesday, September 3, 2024 NA
Stephane Moluh 8/30/2024 Friday, August 30, 2024 WSAXIS-100: Code changes,cleanup, analysis of the flow between GET_DATA and GET_6 for Raw 6 min Water Level. Monday, August 26, 2024 NA
Stephane Moluh 8/23/2024 Friday, August 23, 2024 WSAXIS-100: Code changes and unit testing. Monday, August 19, 2024 No Obstacle
Stephane Moluh 8/16/2024 Friday, August 16, 2024 WSAXIS-100: dev 80% Complete DD-285: GET_DATA ERRDAP: Dev and Testing Monday, August 12, 2024 I had a blocker, but it has been solved
Stephane Moluh 8/9/2024 Friday, August 9, 2024 DD-285: GET_DATA for ERRDAP product Code C1, D1, E1, F1,G1,R1 dev and testing Monday, August 05, 2024 NA
Stephane Moluh 8/2/2024 Friday, August 2, 2024 Wali-825: optimize and format Mean Sea Level Report Wali-812: Work On the optimization Wali-810 : Analyze and started HH_R report Started Reviewing Errdap documentation, attending ERRDAP Meeting, And analyzing ERRDAP SP and GET_DATA Tuesday, July 30, 2024 NA
Stephane Moluh 7/26/2024 Friday, July 26, 2024 Wali-977: Data Inventory Condensed Wali-825 : Ad-Hoc Queries Wali-812 : Great Lakes Report Monday, July 22, 2024 NA
Stephane Moluh 7/19/2024 Friday, July 19, 2024 Wali-825 : Monthly Sea Level, Monthly Means Level, Station Parameter Wali-977: Completed the inventory, daily, monthly, annual condensed inventory data Monday, July 15, 2024 NA
Stephane Moluh 7/12/2024 Friday, July 12, 2024 Wali-825: dev and unit testing done. Integration test in progress Monday, July 08, 2024 NA
Stephane Moluh 7/5/2024 Friday, July 5, 2024 Wali-816: 90% dev and testing WALI-819: Testing Done Wali-789: Dev and Testing done WALI-840: Dev and Test done Wednesday, July 03, 2024 NA
Stephane Moluh 6/28/2024 Friday, June 28, 2024 WALI-789: working on Testing Stored Procedures developed and fixing issues related to formatting WALI-819: Comparing results from report of TBYT between Postgres and Sybase Monday, June 24, 2024 NA
Stephane Moluh 6/21/2024 Friday, June 21, 2024 wali-789: Testing and code changes on Formatting NA NA
Stephane Moluh 6/14/2024 Friday, June 14, 2024 wali-789: dev complete, unit testing in progress Monday, June 10, 2024 NA
Stephane Moluh 6/7/2024 Friday, June 7, 2024 Wali-820 : completion of second batch of Stored Procedures Wali-789 : 75% dev completion Monday, June 03, 2024 NA
Stephane Moluh 5/31/2024 Friday, May 31, 2024 Wali-820: Complete first batch of Stored Procedure, second batch in Progress Thursday, May 30, 2024 NA
Stephane Moluh 5/24/2024 Friday, May 24, 2024 Wali-820 Dev is complete at 75%, multiple new subcalls found and covered Wali-799 In Integration Testing with Tech Lead Wednesday, May 22, 2024 NA
Stephane Moluh 5/17/2024 Friday, May 17, 2024 Wali-799: Dev complete, unit testing complete, integration testing in progress Wali-820: Dev 30% complete, unit testing 30% complete Monday, May 13, 2024 NA
Stephane Moluh 5/10/2024 Friday, May 10, 2024 Wali-836: Completed Wali-837: Completed Wali-799: In Progress Tuesday, May 07, 2024 NA
Stephane Moluh 5/3/2024 Friday, May 3, 2024 Wali-815: Fixing issues Wali-822: Converting stored procedures and functions from Sybase to Postgres. Wali-823: Converting stored procedures and functions from Sybase to Postgres. Monday, April 29, 2024 NA
Stephane Moluh 4/26/2024 Friday, April 26, 2024 Wali-815: Integrating the subcall within the audit_report, testing the whole as against product codes/ devevelop get_audit_trail_list_wpd Wali-825: Work On data.exist and data.counts functions Wali 822: Work on WALI_GET_AVAILABLE_LHAT1 Thursday, April 25, 2024 NA
Stephane Moluh 4/23/2024 Friday, April 19, 2024 Wali-815 : Test Audit_report function developed in postgres, started working on dependent subcall audit_report_monthly NA NA(I was in the office April 15 2024)
Stephane Moluh 4/12/2024 Friday, April 12, 2024 Wali-815: writing equivalent postgres code of audit_report Thursday, April 11, 2024 NA
Stephane Moluh 4/6/2024 Friday, April 5, 2024 Wali-812: Working on Get_6_R report dev and the query Optimization of Accepted_time_series Wali-815: GET_AUDIT_TRAIL_LIST_WPD and AUDIT_REPORT Monday, April 1, 2024 NA
Stephane Moluh 3/30/2024 Friday, March 29, 2024 Wali-812: Working on GET_6_R, completion of dev, working on Testing. Friday, March 29, 2024 NA
Stephane Moluh 3/22/2024 Friday, March 22, 2024 Wali-812: I was able to complete the the report header. Currently working on the report body Wednesday, March 20, 2024 NA
Stephane Moluh 3/9/2024 Friday, March 8, 2024 WALI-812: Worked on Test Case using Wali website, Worked on additional method to process the data from GET_DATA procedure code in java before the flow into GET_6R for Great Lake Tuesday, March 5, 2024 Previously I was work using inaccurate Data, but after discussing with Team lead on Thursday, relevant data are obtained, and code is getting written accordingly.
Stephane Moluh 2/29/2024 Thursday, February 29, 2024 Wali-812: -Running Great Lakes Report In Sybase in debug Mode - Testing Queries Used in GET_6_R from sybase to postgres -Developing the Great Lake Report based on Product code B1 Monday, February 26, 2024 Using Consolidated Testcase, I was able to complete the header of Report
Stephane Moluh 2/25/2024 Friday, February 23, 2024 Wali-812: using the existing methods to develop java's code of the Great Lakes Report Procedure NA NA
Stephane Moluh 2/16/2024 Friday, February 16, 2024 Wali-825: Providing Test Case for Stored Procedure EXIST and code update for its Equivalent in Postgres. Review of Other Existing Stored Procedure and Deep Analysis on MAKE_MEAN_TIME_SERIES. WALI-812: Analyzing different test case to figure out which could be the right one. Tuesday, February 13, 2024 Test Cases for Some of the procedure is an obstacles for the progress, cause the method used to read the Stored Procedure in Sybase is in Debug Mode
Stephane Moluh 2/10/2024 Friday, February 9, 2024 Wali-825: Rewrite Store Procedures (Exist) Wali-810: Review Queries and remove Time Zone table Friday, February 9, 2024 NA
Stephane Moluh 1/31/2024 Wednesday, January 31, 2024 Wali-810: Formatting Report Data and adding data in Txt file Wali-811: Formatting Report Data DMS-1645: DataAPI tested, ERRDAP Testing in progress, Wali Dev Done Monday, January 22, 2024 I am having some issue with my Rapid Sql
Stephane Moluh 1/26/2024 Friday, January 26, 2024 DMS-1645 Update fn_get_6_pos_rowset Updated fn_get_hh_pos_rowset Update fn_get_hl_pos_rowset Update fn_get_mean_pos_rowset In the updated version fn_get_tmz_pos has been removed Schema has been added in the code root queries tested with and without tmz whenever it was called NA NA
Stephane Moluh 1/21/2024 Friday, January 19, 2024 Wali-811: Monthly Means txt file for the report Wednesday, January 17, 2024 NA
Stephane Moluh 1/12/2024 Friday, January 12, 2024 Wali-811: Loop By year: Quality Level Quality Level Query Quality Level DAO Quality Level within Loop By Year  Method whenever we have sensor  "WL" Form Feed(but its logic is empty on sybase) Title( a printout could be revealed on the console as) Insert a Header Before each Year Wednesday, January 10, 2024 NA
Stephane Moluh 1/7/2024 Friday, January 5, 2024 Wali-811 Loop By Year Get Time Meridian, Direction Station Identifier  (query, DAO, Service and integration in the java getTimeMeridian method) Identify Source Table From Input Sensor Location ID(queries on Deployment based on parameter i, Dao, Service and integration in the java getTimeMeridian Method) DCP Location ID. Station Location ID Get Local Time Meridian, Direction, Shift. Quality Level Tuesday, January 2, 2024 NA